The Drawing Changed. The Cost Model Didn't.
A supplier's engineered-part quote can become commercially misleading when the drawing, production route or volume assumption changes without an equivalent update to the cost model. A revision-controlled quote basis helps procurement isolate real cost changes, challenge unsupported increases and make sourcing decisions on comparable terms.
Read more →